AES Mong Duong Power Company Limited
AES Mong Duong Power Company Limited
AES-VCM
  • Home
  • About Us
    • Overview
    • Mission, Vision and Values
    • Our Leadership
    • Ethics & Compliance
    • Awards & Recognitions
  • Project
    • Overview
    • Project pictures
    • Drone video
  • News
    • AES Mong Duong News
    • Community
    • AES In The News
  • Sustainability
    • Social Policy
    • Environment, Health & Safety
    • Sustainability Report
  • Careers
  • Pictures & Video
    • Pictures
    • Videos
  • Contact
  • aes.com
 
  • Home
  • About Us
    • Overview
    • Mission, Vision and Values
    • Our Leadership
    • Ethics & Compliance
    • Awards & Recognitions
  • Project
    • Overview
    • Project pictures
    • Drone video
  • News
    • AES Mong Duong News
    • Community
    • AES In The News
  • Sustainability
    • Social Policy
    • Environment, Health & Safety
    • Sustainability Report
  • Careers
  • Pictures & Video
    • Pictures
    • Videos
  • Contact
  • aes.com

Preventive measures at the Coal-Fired Plant in Quang Ninh

17/04/2020AES in the news, News

1a

As one of the large and modern BOT Coal-Fired Power projects in Vietnam, Mong Duong II Coal-Fired Power Plant (AES Mong Duong Power Company Limited) has made many contributions to the national grid, especially when Vietnam’s energy supply is shortage.

According to the plan assigned by the Ministry of Industry and Trade, in 2020, the plant will produce nearly 8.7 billion kWh of electricity (increasing nearly 1 billion kWh of electricity compared to 2019). To ensure the plan, from January to now, 2 units of the Plant are operating at full capacity. By the end of the first quarter of 2020, the plant has produced 2.5 billion kWh (8% higher than planned).

The number of employees in the plant is currently about 200, the number of employees of contractors is 150. These includes many foreign experts and workers from other localities throughout the country.

Safety first is the value at AES Mong Duong Power Co., Ltd, the Company always takes strict precautions to ensure not only the health of employees, but also ensure the continuity and stability of the electricity production, especially during the critical situation of Covid-19 period. This continues to strongly demonstrate the commitment of AES Mong Duong Power Company Limited to the long-term development of the local community in Quang Ninh province.

1a

As one of the large and modern BOT Coal-Fired Power projects in Vietnam, Mong Duong II Coal-Fired Power Plant (AES Mong Duong Power Company Limited) has made many contributions to the national grid, especially when Vietnam’s energy supply is shortage.

According to the plan assigned by the Ministry of Industry and Trade, in 2020, the plant will produce nearly 8.7 billion kWh of electricity (increasing nearly 1 billion kWh of electricity compared to 2019). To ensure the plan, from January to now, 2 units of the Plant are operating at full capacity. By the end of the first quarter of 2020, the plant has produced 2.5 billion kWh (8% higher than planned).

3a

The number of employees in the plant is currently about 200, the number of employees of contractors is 150. These includes many foreign experts and workers from other localities throughout the country.

4a

Safety first is the value at AES Mong Duong Power Co., Ltd, the Company always takes strict precautions to ensure not only the health of employees, but also ensure the continuity and stability of the electricity production, especially during the critical situation of Covid-19 period. This continues to strongly demonstrate the commitment of AES Mong Duong Power Company Limited to the long-term development of the local community in Quang Ninh province.

Related posts
Olivier Marquette Joins Forum Celebrating 30 Years of Vietnam–U.S. Relations
11/07/2025
AES Mong Duong Supports Community Wellness with New Football Field in Hai Hoa Commune
10/07/2025
TOURNAMENT RECAP – LAUNCH OF AES MONG DUONG PICKLEBALL CLUB – JUNE 2025
05/07/2025
AES Vietnam President Meets with EVN Leadership to Advance Strategic Energy Projects
21/05/2025
AES Mong Duong APEX 2025: Celebrating Innovation and Excellence
14/05/2025
AES Vietnam Celebrates Safety Day 2025: Safety First, Protect What Matters Most
13/05/2025
  • News
  • Community
  • AES Mong Duong News
  • AES In The News
  • Careers
  • Pictures & Video
    • Pictures
    • Videos
Lastest News
  • Olivier Marquette Joins Forum Celebrating 30 Years of Vietnam–U.S. Relations
    11/07/2025
  • AES Mong Duong Supports Community Wellness with New Football Field in Hai Hoa Commune
    10/07/2025
  • TOURNAMENT RECAP – LAUNCH OF AES MONG DUONG PICKLEBALL CLUB – JUNE 2025
    05/07/2025
  • AES Vietnam President Meets with EVN Leadership to Advance Strategic Energy Projects
    21/05/2025
  • AES Mong Duong APEX 2025: Celebrating Innovation and Excellence
    14/05/2025
  • About Us |
  • Projects |
  • News |
  • Sustainability |
  • Careers |
  • Pictures & Videos |
  • Contact
Main office in Quang Ninh:
Mong Duong ward, Quang Ninh province
Tel: +84 203 626 1089, Fax: + 84 203 396 2600
Emai: aesmd.communication@aes.com
recruitment.aes-vcm@aes.com (For Applicants)
Website: www.aesmongduong.vn
Representative office in Hanoi:
Unit 302, Asia Tower, 6 Nha Tho street,
Hoan Kiem ward, Hanoi City
Tel: +84 24 6271 0531 Fax: + 84 24 3933 3579
Emai: aesmd.communication@aes.com
recruitment.aes-vcm@aes.com (For Applicants)
Website: www.aesmongduong.vn

Find us on:

"Reproduction in whole or in part in any form or medium without the express written permission of AES Mong Duong Power Company Ltd., is prohibited. The AES and the AES Mong Duong logos are trademarks of The AES Corporation."
Copyright © 2020 The AES Mong Duong. All rights reserved.https://tragodi.com

Designed by Biso.vn